Skip to content

COMMIT4.0EB- COntrol and ManageMent systems using information and communications Technologies FOR ZERO Energy Buildings

COMMIT4.0EB- COntrol and ManageMent systems using information and communications Technologies FOR ZERO Energy Buildings
Start date: 1 September, 2022
End date: 1 August, 2025
Code: PID2021-126889OB-I00

Participants

  • Centro de Investigaciones en Energía Solar CIESOL (España), centro mixto UAL-CIEMAT
  • Grupo de Inv. “Automática, Robótica y Mecatrónica”. Universidad de Almería (TEP 197)

Contacts

José Domingo Álvarez Hervás (jhervas@ual.es)

Manuel Pérez García (mperez@ual.es)

Funds:

Proyecto PID2021-126889OB-I00 financiado por MCIN/ AEI /10.13039/501100011033/ y por FEDER Una manera de hacer Europa

Current Situation:

In progress

Summary

This project proposes the development of advanced controllers for the three levels listed in the previous paragraph that will be validated in a bioclimatic building, the CIESOL building, which is placed at the campus of the University of Almería. This building uses ICT to monitor various physical variables in most of its enclosures, as well as the production and consumption of each of its components. The developed controllers will be validated with real tests, for which it will be necessary: i) to develop a digital twin of the building that allows modelling and predicting the production and consumption of the different systems that make up the building, ii) the analysis of thermal and electrical consumptions within the building and the production by the systems based on renewable energies that the building has integrated (flat solar collectors and photovoltaic panels). Specific integration and optimization options that result in a preponderant use of such systems will be evaluated; iii) the development of advanced controllers to manage the building energy at various levels in order to overlap the building demand and production curves, maximizing the energy produced by renewable energy sources whereas energy consumption from the electrical grid is minimized.

Otros proyectos

Silestone® Silica Free Advanced (FREE ADVANCED-COSENTINO)

Fecha inicio: 1 January, 2022
Start date: January 1, 2022
Fecha fin: 31 December, 2023
End date: December 31, 2023
Código: -
Code: -

More Efficient Heliostat Fields for Tower Solar Plants (HELIOSUN)

Fecha inicio: 1 September, 2022
Start date: September 1, 2022
Fecha fin: 31 August, 2025
End date: August 31, 2025
Código: PID2021-12685OB-I00
Code: PID2021-12685OB-I00

CyberGreen- CYBERphysical control architecture for the optimization of the water-energy-carbon-food nexus in GREENhouse

Fecha inicio: 1 September, 2022
Start date: September 1, 2022
Fecha fin: 1 August, 2025
End date: August 1, 2025
Código: PID2021-122560OB-I00
Code: PID2021-122560OB-I00

Upgrading Wastewater Treatment Plants by Low Cost Innovative Technologies for Energy Self-Sufficiency and Full Recycling. (LIFE ULISES)

Fecha inicio: 1 July, 2019
Start date: July 1, 2019
Fecha fin: 30 June, 2023
End date: June 30, 2023
Código: LIFE18 ENV/ES/000165
Code: LIFE18 ENV/ES/000165

Bioplastics Production from Carbon Captured in Household Waste Incineration Fumes (SETEC)

Fecha inicio: 1 May, 2016
Start date: May 1, 2016
Fecha fin: 30 May, 2021
End date: May 30, 2021
Código: ---
Code: ---

Applications for zoosporic parasites in aquatic systems” (ParAqua)

Fecha inicio: 1 January, 2022
Start date: January 1, 2022
Fecha fin: 1 January, 2024
End date: January 1, 2024
Código: -
Code: -

Next generation water-smart management systems: large scale demonstrations for a circular economy and society (WATER-MINING)

Fecha inicio: 1 September, 2020
Start date: September 1, 2020
Fecha fin: 1 August, 2023
End date: August 1, 2023
Código: H2020: 869474
Code: H2020: 869474

Solar field measurements to improve performance (LEIA)

Fecha inicio: 1 December, 2022
Start date: December 1, 2022
Fecha fin: 30 November, 2025
End date: November 30, 2025
Código: -
Code: -

Water Regeneration by Concentrated Solar Power (RAYO)

Fecha inicio: 5 October, 2021
Start date: October 5, 2021
Fecha fin: 31 March, 2023
End date: March 31, 2023
Código: -
Code: -